SECNAV 7810.12C 造船进度付款

VIP文档

ID:56192

阅读量:0

大小:0.23 MB

页数:4页

时间:2023-05-14

金币:10

上传者:战必胜
DEPARTMENTOFTHENAVY
OFFICE
OF
THE
SECRETARY
1000
NAVY
PENTAGON
WASHINGTON,
D.C.
20350-1000
SECNAVINST
7810.12C
ASN(RDA)
DASN(ACQ)
23
December
2005
SECNAV
INSTRUCTION
7810.12C
From:
Secretary
of
the
Navy
Subj:
SHIPBUILDING
PROGRESS
PAYMENTS
Ref:
(a)
Federal
Acquisition
Regulation
Subpart
32.5
(b)
Federal
Acquisition
Regulation
Subpart
52.232.16
1.
Purpose.
To
authorize
progress
payments
based
on
a
percentage
of
completion
for
fixed
price
and
fixed
price
incentive
contracts
for
shipbuilding
or
ship
conversion,
alteration,
or
repair.
This
instruction
implements
the
provisions
of
10
U.S.C.
2307
and
is
a
revision
of
SECNAV
Instruction
7810.12B.
This
Instruction
has
been
administratively
revised
and
should
be
reviewed
in
its
entirety.
2.
Cancellation.
SECNAVINST
7810.12B
3.
Scope.
This
instruction
shall
apply
to
all
Navy
contracts
for
shipbuilding
(including
small
boats)
or
ship
conversion,
alteration,
or
repair,
sometimes
referred
to
herein
collectively
as
shipbuilding
contracts,
entered
into
on
or
after
the
approval
date
of
this
SECNAVINST,
except
cost
reimbursement
type
contracts
and
Master
Ship
Repair
Contracts
(DOD
Federal
Acquisition
Regulation
(FAR)
Supplement
Subpart
217.71).
For
all
other
contracts
(except
contracts
for
construction,
as
defined
in
FAR
Subpart
36.102),
including
any
separate
contracts
for
engines,
machinery,
equipment,
or
other
components
for
ships,
the
only
type
progress
payment
provisions
will
be
those
based
on
costs
in
accordance
with
reference
(a).
4.
Small
boat
contracts.
The
progress
payments
clause
shown
in
reference
(b) may
be
used
in
small
boat
acquisition
contracts
when
deemed
appropriate
with
respect
to
the
size
of
the
contract
and
length
of
performance.
This
clause
provides
for
progress
payments
based
on
cost
incurred
for
work
accomplished.
In
such
cases,
the
requirements
of
reference
(a)
are
applicable.
Payment
of
progress
payments
on
small
boat
contracts
by
any
method
other
than
physical
completion
or
costs
incurred
as
provided
herein
requires
the
approval
of
Assistant
Secretary
of
the
Navy
(Research,
Development
&
Acquisition)
Deputy
Assistant
Secretary
for
Acquisition
Management
(DASN
ACQ)
.
5.
Progress
payments
based
on
percentage
of
physical
completion.
Shipbuilding
contracts
(with
the
exceptions
set
forth
in
paragraphs
3
and
4
above)
will
provide
for
progress
payments
commensurate
with
the
work
that
has
been
accomplished
that
meets
the
standard
of
quality
established
under
the
contract
as
approved
by
the
Contracting
Officer.
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭