UFGS MASTER DATABASE TRACKING CHART
MASTER FORMAT
2004 DIVISIONS
AND SECTION
NUMBERS
RECOMMENDATIONS, EDITING.
SUBMITTED FOR
QA & POSTING
CURRENT
UPDATE OR
POSTING
VERIFIED
GROUP I m/d/yr m/d/yr m/d/yr m/d/yr m/d/yr m/d/yr
DIVISION 00
00 01 15 NAVFAC 02/11
Recommend renaming "List of Drawing Sheets", deleted references to diskettes. Change 1-Added editor's note to import
list of drawings as Excel XML spreadsheet.
8/1/14 8/15/14
00 22 13 NAVFAC
05/12
reference update: modofied subpart 1.1 Deleted Section; superseded by 00 22 13.00 20. 5/20/11
00 22 13.00 20 NAVFAC 05/14
New Section; supersedes 00 22 13. Change 1 -Changed Physical Security Equipment (PSE) to Electronic Security
Equipment (ESS) and modified FF&E and A/V CLIN. Change 2-Administrative, revised use of "The Contractor" and "shall."
5/20/14
00 41 00 NAVFAC 01/07
Deleted, Superseded by 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS through unification
8/15/14
Recommend removal of local specification from database - DWG approved removal on 5/2/07 Change 1- Deleted subpart
1.3.1.3 "Waiver for Workers' Compensation." Change 2-Added requirement for restrictions on Radio Transmitter
Equipment previously located in Section 01 57 19.02.
2/25/14
00 73 03 NAVFAC 08/08
Recommend removal of local specification from database - DWG approved removal on 5/2/07 8/15/08
00 73 04 NAVFAC 08/08 Recommend removal of local specification from database - DWG approved removal on 5/2/07 8/15/08
GROUP II
DIVISION 01
01 11 00 NAVFAC 08/15
Revised throughout. Removed Project Environmental Goals covered under section 01 33 29. 8/1/15 8/14/15
Tailoring and changes for NAVFAC NW throughout. Change 2-Fixed tailoring and bracket issue throughout. Revised
Employment Restrictions for Bremerton, WA. Change 3-Added requirement for utility cutover and connection to existing
sanitary sewer line. Change 4-Incorporation of DBIDS procedures for access to NAVY Installations.
8/3/17 8/24/17
01 20 00.00 10 USACE 08/15
Scheduled maintenance update of section. Superseding UFGS 01 22 00.00 10 MEASUREMENT AND PAYMENT to
comply with CSI MasterFormat.
8/1/15 8/14/15
01 20 00.00 20 NAVFAC 11/11
Change 1-Updated invoice form numbers and DFARS clause for submission of Invoices. 11/15/11
01 20 01.00 10 USACE 04/06
DELETED - Scheduled maintenance update of section. Superseded by UFGS 01 35 13.43 10 SPECIAL PROJECT
PROCEDURES FOR CONTAMINATED SITES.
01 22 00.00 10 USACE 07/06
DELETED - Scheduled maintenance update of section. Superseded by UFGS 01 22 00.00 10 PRICE AND PAYMENT
PROCEDURES in compliance with CSI MasterFormat.
8/1/15 8/14/15
01 30 00 NAVFAC 08/15
Revised throughout. 8/1/15 8/14/15
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
Change 1-Changed submittal period of Personnel List, personnel roles, and removed Certified Payrolls, Invoice, and
Routine Correspondence from Table 1; Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Change 2-Incorporation of eCMS Transmittal function into Table 1.
4/23/17 8/3/17 5/18/18
01 32 01.00 10 USACE 02/15
Complete Section review and refresh 2/1/15 2/20/15
01 32 16.00 20 NAVFAC 02/15
Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule
Monthly Updates, and Contract. Change 1-Administrative changes to use of "must." Modified Monthly Network Analysis
and Contract Administration paragraphs. Change 2-Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
5/1/15 5/15/15
01 32 17.00 20 NAVFAC 05/18
Title changed from NETWORK ANALYSIS SCHEDULES (NAS); thoroughly revised to Primavera P6, Updated WBS &
Activity Codes and Settings. Change 1-Administrative changes to use of "must." Modified Monthly Network Analysis and
Contract Administration paragraphs. Change 2-Revised the Time Impact Analysis (TIA) action for Concurrent Delays. 5/18-
Revision-Combined with DB Section 01 32 17.05 20. Updated Activity Identification and Organization, Design Activities,
and Time Impact Analysis. Added Commissioning Activities.
Last para., General Note, changed CONSTRUCTION to DESIGN-BID-BUILD within the Army tailoring tag. Section 26 12
19.20 was replaced by 26 12 21 SINGLE-PHASED PAD-MOUNTED TRANSFORMERS at Subpart 1.5.1.2. Change 4-Tri-
Annual Database Maintenance (TADM), which consists of: Tailoring changes, incorporation of Sustainability requirements,
CCR's and verification of all reports and spelling. Change 5-Per USACE request, adjusted the Note in the following
subparts, 1.4.1, 1.4.3, 1.11.4, to let the designers know they can only use the wording in the Model RFP for guidance but
can't get the file, Section 01 33 16 Design After Award is not a UFGS Section. Change 6-Subpart 1.2.1, under SD-11,
deleted the mention of DD Form 1354; Subpart 1.4.7, corrected typo, changed tittle to Sustainability Reporting Submittals
(S), revised the 1st and 2nd paragraph ; added Sub[art 1.6.10, 1.6.10.1 and 1.6.11; Subpart 1.11.1, revised paragraph;
added paragraph "j." to Subpart 1.11.3; Subpart 1.13, added the word "Contract" prior to the word clause, entitled
"Changes." Change 7-Incorporated outstanding CCR's. Change 8-Revised the following three subparts, 1.4.1, 1.4.3, 1.11.4,
due to releasing Section 01 33 16.00 10 DESIGN DATA [DESIGN AFTER AWARDS] for use on USACE Design-Build
projects only. Change 9-Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT
MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
Change 9-Updated to coordinate archiving of Navy Section 23 09 23.13 20 to meet the requirement of 10 USC 2867 to
adopt a "Department-wide, Open Protocol, Energy Monitoring and Utility Control System Specification" for use in military
construction and military family housing activities.: Changed MSDS to SDS
01 33 16.00 10
DESIGN DATA (DESIGN AFTER AWARD)
USACE 05/16
New UFGS for use on USACE Design-Build projects only
5/10/16 5/26/16
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
Action delayed, to be reviewed/resolved at next SICCCB meeting, *** More than 12 months
GROUP, DIVISION, AND SECTION TITLE
CURRENT UFGS MASTER DATABASE LISTINGS
REVIEW AND EDITING PROCESS
Recommended changes on Army and Navy sections related to CSI MF '10
ESC assigned NASA sections for editing
Progress bar / Date of action or "-" for no response by deadline
ESC assigned DoD groups (sections) for editing. "*" Not approved to proceed with editing.
Task completed, section reviewed, QA'd, posted
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
COST AND PERFORMANCE REPORT
ADMINISTRATIVE REQUIREMENTS
PRICE AND PAYMENT PROCEDURES
SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY PROJECTS
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
SUPPLEMENTARY CONDITIONS FOR PROJECTS IN THE MEDITERRANEAN AREA
PRICE AND PAYMENT PROCEDURES
ESC Engineering Services is a Government Contractor for NASA working out of the Kennedy Space Center who has been tasked to do the editing of all NASA specification sections. Upon NASA joining DoD as a participant
of the Unified Facilities Guide Specifications (UFGS) and the tasking from DoD to assist in the editing of Army and Navy sections, it was determined that a method of tracking the status of a particular section was needed,
thus the creation of this spreadsheet. Each of the active agencies have Technical Proponents (TP's) who meet called Design Working Groups (DWG). These people and groups are responsible for reviewing, commenting,
editing and approving changes made to all specifications within the UFGS. This spreadsheet is used to know what sections are being edited, by who, and what the progress is based upon the date listed and graphically by
the "red" progress bar. Listed below are all of the sections currently found within the UFGS, who the proponent (responsible agency) is, a comments column and then a series of steps required for posting for public use.
Prepared by Kennedy Infrastructure, Applications, and Communications Contract 1 of 21 5/16/2018