从2006年4月到2019年2月的UFGS累积修订清单

ID:30865

大小:2.31 MB

页数:75页

时间:2023-01-15

金币:5

上传者:战必胜
LISTING OF
UPDATED, NEW, DELETED
UNIFIED FACILITIES GUIDE SPECIFICATIONS
February 2019
Sorted by ascending order of UFGS Number then by descending order of Old Date 1
Preparing
Activity
Section
Number
Title Revised
Added
(New)
Deleted
Old Date Nature of Change
N 00 01 15 LIST OF DRAWINGS Feb-11 Jan-07
Deleted references to diskettes
N 00 01 15
LIST OF DRAWINGS
Jan-07 Apr-06
N 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS May-11 Aug-08 Reference update: modified subpart 1.1
N 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS Aug-08 Jan-07 Minor revisions throughout
N 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
Jan-07 Apr-06
N 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS Feb-14 May-11 Deleted; superseded by 00 22 13.00 20
N 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS Feb-14 New; supersedes 00 22 13
A 00 31 10
METRIC MEASUREMENTS Aug-13 Apr-06 Section removed from UFGS
N 00 41 00
BID SCHEDULES Jan-07 Apr-06
N 00 41 00
BID SCHEDULES
Aug-14
Jan-07
Deleted, Superseded by 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS through
unification
A 00 62 35
RECYCLED / RECOVERED MATERIALS Jul-06 Apr-06 Superseded by 01 62 35
N 00 73 01
SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY
PROJECTS
Aug-08 Apr-06
New title
N 00 73 02
SUPPLEMENTARY CONDITIONS FOR ICELAND PROJECTS
Aug-08 Apr-06 New title
N 00 73 02
SUPPLEMENTARY CONDITIONS FOR ICELAND PROJECTS May-12 Aug-08 Deleted - base in Iceland is now closed.
N 00 73 03
SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS Aug-08 Apr-08 New title
N 00 73 03
SUPPLEMENTARY CONDITIONS FOR AZORES PROJECTS Nov-18 Aug-18 Section is outdated and not used.
N 00 73 03
SPECIAL CONDITIONS FOR AZORES PROJECTS Apr-08 Oct-07 Added URL for graphics
N 00 73 03
SPECIAL CONDITIONS FOR AZORES PROJECTS Oct-07 Apr-06 Renumber paragraphs
N 00 73 04
SUPPLEMENTARY CONDITIONS FOR PROJECTS IN
MEDITERRANAN AREA
Aug-08 Apr-08
New title
N 00 73 04
SPECIAL CONDITIONS FOR PROJECTS IN
MEDITERRANEAN AREA
Apr-08 Apr-06
Added URL for graphics
N 01 11 00
SUMMARY OF WORK Aug-15 Aug-11 Revised throughout. Removed Project Environmental Goals covered under section 01 33 29.
N 01 11 00
SUMMARY OF WORK Aug-11 Jan-08
Modifed note before part 1; modified note in subpart 1.14.1; added note in part 1.5; removed all
notes in part 3
N 01 11 00
SUMMARY OF WORK Jan-08 Jul-07 Added NASA requirements; superseding 01 11 00.00 40
N 01 11 00 SUMMARY OF WORK Jul-07 Jul-06
Corrected hyperlink to CCB.
N 01 11 00
SUMMARY OF WORK Jul-06 Apr-06 Added sustainable design requirements
S 01 11 00.00 40 SUMMARY OF WORK Jun-06 Superseding 01 11 10.00 40
S 01 11 00.00 40 SUMMARY OF WORK Jan-08 Jun-06 Superseded by 01 11 00
S 01 11 10.00 40 SUMMARY OF WORK Jun-06 Apr-06 Superseded by 01 11 00.00 40
N 01 14 00
WORK RESTRICTIONS Nov-11 May-11 Deleted subpart 1.5.18: "Commonwealth of Puerto Rico"; modified subparts 1.5.7 and 1.5.9
N 01 14 00
WORK RESTRICTIONS May-11 Jul-07 modified subparts 1.4.1.2, 1.4.1.3, 1.4.10 and 1.5.7
N 01 14 00
WORK RESTRICTIONS Jul-07 Jul-06 Added paragraph on smoking policy.
N 01 14 00
WORK RESTRICTIONS Jul-06 Apr-06 Added NAVFAC Pacific color restrictions
N 01 14 00
WORK RESTRICTIONS Apr-06 Jan-06 Various changes to incorporate Navy Regional requirements
N 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES Nov-11 Aug-11 Modified note in subpart 1.5.g
N 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES Aug-11 Feb-11 Modified subpart 1.5.1
N 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES Feb-11 Feb-10 Major revision
N 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES Feb-10 Aug-09 Modified subpart 1.3.2; title change and paragraph change
N 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES Aug-09 Jul-06
Updated the last criteria NOTE (Cost-loaded NAS) in the introduction; updated subparts 1.3, 1.5,
1.6, 1.7.2
N 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES Jul-06 Apr-06 Added requirements relating to precast/prestressed concrete piles
A 01 20 01.00 10
COST AND PERFORMANCE REPORT Aug-15 Apr-06
Scheduled maintenance update of section. Superseded by UFGS 01 35 13.43 10 SPECIAL
PROJECT PROCEDURES FOR CONTAMINATED SITES.
A 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES Aug-15 Apr-06
Scheduled maintenance update of section. Superseding UFGS 01 22 00.00 10 MEASUREMENT
AND PAYMENT to comply with CSI MasterFormat.
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭