**************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-26 05 48.00 10 (October 2006)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-26 05 48.0
0 10 (April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 05 48.00 10
SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
10/07
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
1.2.2 Electrical Equipment
1.2.3 Electrical Systems
1.2.4 Contractor Designed Bracing
1.2.5 Conduits Requiring No Special Seismic Restraints
1.3 EQUIPMENT REQUIREMENTS
1.3.1 Rigidly Mounted Equipment
1.3.2 Nonrigid or Flexibly-Mounted Equipment
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 LIGHTING FIXTURE SUPPORTS
2.2 SWAY BRACING MATERIALS
PART 3 EXECUTION
3.1 SWAY BRACES FOR CONDUIT
3.2 LIGHTING FIXTURES IN BUILDINGS
3.2.1 Pendant Fixtures
3.2.2 Ceiling Attached Fixtures
3.2.2.1 Recessed Fluorescent Fixtures
3.2.2.2 Surface-Mounted Fluorescent Fixtures
3.2.3 Assembly Mounted on Outlet Box
3.2.4 Wall-Mounted Emergency Light Unit
3.2.5 Lateral Force
-- End of Section Table of Contents --
SECTION 26 05 48.00 10 Page 1