USACE / NAVFAC / AFCEC / NASA UFGS-03 37 29 (November 2009)
------------------------------------
Preparing Activity: USACE Superseding
UFGS-03 37 29 (
April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2022
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 37 29
CONCRETE FOR CONCRETE CUTOFF WALLS
11/09
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Coring Concrete in Completed Panels
1.1.1.1 Payment
1.1.1.2 Measurement
1.1.2 Unit of Measure
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Government Testing and Sampling
1.4.2 Preconstruction Sampling and Testing
1.4.2.1 Aggregates
1.4.2.2 Cementitious Materials and Admixtures
1.4.3 Construction Testing by the Government
1.4.3.1 Chemical Admixtures Requirements
1.4.3.2 Cement and Pozzolan
1.4.3.2.1 Prequalified Cement Sources
1.4.3.2.2 Prequalified Pozzolan Sources
1.4.3.2.3 Nonprequalified Cement Sources
1.4.3.2.4 Nonprequalified Pozzolan Sources
1.4.3.3 Concrete Tests
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Maximum Water-Cement Ratio
2.1.2 Cement Content
2.1.3 Nominal Maximum-Size Coarse Aggregate
2.1.4 Fine Aggregate
2.1.5 Air Content
2.1.6 Slump
2.1.7 Responsibility of Mixture Proportioning
2.1.8 Concrete Proportioning
SECTION 03 37 29 Page 1