USACE / NAVFAC / AFCEC / NASA UFGS-23 08 00.00 20 (February 2021)
Change 1 - 05/21
------------------------------------
Preparing Activity: NAVFAC
UNIFIED FACILITIES GUIDE SPECIFICATIONS
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 08 00.00 20
COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS
02/21, CHG 1: 05/21
PART 1 GENERAL
1.1 DEFINITIONS
1.2 SEQUENCING AND SCHEDULING
1.3 SUBMITTALS
1.4 ACCESSIBILITY REQUIREMENTS
1.5 COORDINATION
1.6 PIPE FLUSHING, TESTING, AND WATER TREATMENT REPORTS
1.7 CERTIFICATE OF READINESS DOCUMENTATION
PART 2 PRODUCTS
2.1 TEST EQUIPMENT
2.1.1 Proprietary Equipment
2.1.2 Calibration and Accuracy
PART 3 EXECUTION
3.1 MEETINGS
3.2 PREFUNCTIONAL CHECKS
3.3 STARTUP AND INITIAL CHECKOUT
3.4 COMMISSIONING TESTING
3.4.1 Preparation
3.4.2 Test Setup
3.4.3 Manufacturer's Representative
3.4.4 Sample Strategy
3.4.5 Simulating Conditions
3.4.6 Duct Air Leakage Test (DALT) Report Review
3.4.7 Duct Air Leakage Test (DALT) Report Verification
3.4.8 Testing, Adjusting, and Balancing (TAB) Report Review
3.4.9 Testing, Adjusting, and Balancing (TAB) Report Verification
3.4.10 HVAC Controls Test Procedures, Reports, and Trends Review
3.5 RETESTING REQUIREMENTS
3.6 SYSTEM ACCEPTANCE
3.7 SEASONAL TESTS
3.8 FULL-LOAD TESTS
SECTION 23 08 00.00 20 Page 1