DATA ITEM DESCRIPTION
Title: Performance and Cost Report
Number: DI-FNCL-80912A Approval Date: 20190812
AMSC Number: 10075 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: MI Project Number: FNCL-2019-003
Applicable Forms:
Use/relationship: The Performance and Cost Report provides current status and projected
requirements of funds, man-hours, and work completion. The report is used for evaluation of
contractor progress.
a. This Data Item Description (DID) contains the format, content, and intended use information
for the data deliverable resulting from the work task described in the solicitation.
b. This DID supersedes DI-FNCL-80912.
Requirements:
1. Reference Documents. None.
2. Format. The Performance and Cost Report format shall be in contractor format and machine
readable by the Government.
3. Content. The Performance and Cost Report shall contain the following:
3.1 Man-hours. Total man-hours expended by technical categories or program tasks, cumulative
total man-hours to date, and percentages of total man-hours spent to date. State whether or not
remaining hours are sufficient to complete the task.
3.2 Funds. Total funds expended, by task, for the month; cumulative total funds spent to date; and
percentage of total contract funds spent to date. State whether or not remaining funds are
sufficient to complete the task. The report shall include cost variance.
3.3 Work completion. Percentage of work completed, by tasks during the month and cumulative
percentage of total contract work completed to date.
End of DI-FNCL-80912A.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭