DI FNCL 82132 数据项说明(DID)通用成本方法(CCM)(2017年6月13日)

ID:44167

大小:0.08 MB

页数:8页

时间:2023-03-17

金币:20

上传者:战必胜
DATA ITEM DESCRIPTION
Title: COMMON COST METHODOLOGIES (CCM)
Number: DI-FNCL-82132 Approval Date: 20170613
AMSC Number: 9818 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: MDA Project Number: FNCL-2017-001
Applicable Forms: N/A
Use/Relationship: The Common Cost Methodologies (CCM) obtains documentation
of the methods used to generate cost estimates between the MDA program cost team
and the prime contractor and major subcontractors supporting the program.
This DID contains the format, content, and intended use information for the data
deliverable resulting from the work task described in the solicitation.
This Data Item Description (DID) summarizes the format for Common Cost Methodologies
and provides preparation instructions to support the specific data and frequency requirements
specified in the contract.
Requirements:
1.
Reference documents. The applicable issue of the documents cited herein, including
their approval dates and dates of any applicable amendments, notices, and revisions, shall
be as stated in the contract.
2.
Format. Products delivered to the MDA must be in a un-password protected,
unencrypted electronic format.
3.
Content. Common Cost Methodology shall be required of any scope expected to incur
cost of which cost-estimating methodology is of interest to the government.
4.
Implementation. Contractors shall implement Common Cost Methodology reporting
requirements on all contracts and subcontracts that meet the reporting thresholds
determined by the Government Program Office.
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭