TOP-10-2 204测试操作程序(TOP)10 2 204个人防护装备(非弹道)软装甲的一般测试(2012年7月23日)

ID:41418

大小:2.10 MB

页数:122页

时间:2023-03-15

金币:20

上传者:战必胜
REPORT DOCUMENTATION PAGE
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and Reports (0704-
0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to
any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY)
23-07-2012
2. REPORT TYPE
Final
3. DATES COVERED (From - To)
4. TITLE AND SUBTITLE
Test Operations Procedure (TOP) 10-2-204, General Tests of Personal
Protective Equipment (Non-ballistic) - Soft Armor
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHORS
5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)
Commander
U.S. Army Aberdeen Test Center
TEDT-AT-WFS
Aberdeen Proving Ground, MD 21005-5059
8. PERFORMING ORGANIZATION
REPORT NUMBER
TOP 10-2-204
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
Range Infrastructure Division (CSTE-TM)
US Army Test and Evaluation Command
2202 Aberdeen Boulevard
Aberdeen Proving Ground, MD 21005-5001
10. SPONSOR/MONITOR’S
ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT
NUMBER(S)
Same as item 8
12. DISTRIBUTION/AVAILABILITY STATEMENT
Distribution Statement A. Approved for public release; distribution is unlimited.
13. SUPPLEMENTARY NOTES
Defense Technical Information Center (DTIC), AD No.: ADA566201
14. ABSTRACT
This Test Operations Procedure (TOP) describes general procedures for conducting nonballistic testing of soft armor
systems. Tests include Bulk Materials, Visual Inspection, Bartacks, Component and Assembly, Construction Design,
Emergency Release Mechanism, Functional Integration, Hardware, Label Verification: Verbiage, Label Verification:
Dimensions and Font, Open Seam, Stitch Count, Stitch and Seam Type, Raw Edges, Stitch Tension, Thread Ends,
Weight, Materials Inspection Testing, Ballistic Filler Weight, Ballistic Panel Subcomponent Fit and Area, Bartack
Holding Strength, Dimensions: Bartack Length, Distance between Bartacks, Distance between Horizontal Webbing,
Buttonhole Cut, Length and Width, Drag Strap Extension Test Using Instron Machine, Emergency Release Anchor
Webbings, Pattern Matching, Pattern Matching: Ballistic Filler, Ply Count, Thickness: Ballistic Filler, and Vertical
Alignment of Bartacks.
15. SUBJECT TERMS
Soft Body Armor Personal Protective Equipment Non-ballistic
17. LIMITATION OF
ABSTRACT
SAR
18. NUMBER
OF
PAGES
59
19a. NAME OF RESPONSIBLE PERSON
a. REPORT
B. ABSTRACT
C. THIS PAGE
Unclassified
Unclassified
Unclassified
19b. TELEPHONE NUMBER (include area code)
Standard Form 298 (Rev. 8-98)
Prescribed by ANSI Std. Z39-18
Downloaded from http://www.everyspec.com
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭